জব সল্যুশন [৯ম - ১৩তম গ্রেড]
The elevator in a eleven-storied office building travels at the rate of one floor per 1/4 minute, which allows time for picking up and letting down passengers. At the main floor and at the top floor the operator stops for 1 minute. How many complete (return) trips will the operator makes during a 7 hour period?